The Timber Frame Of A Livng Room Wall Before The Gyprock Sheet is On ready For The Rough In Of Pipes And Condensation Water Pipe
Gyprock Wall Is Done After The Rough In Of Copper Pipes, Electricals And Condensation Water Pipe With The Ends Of Pipes Properly Sealed
Another Room With Gyprock Wall Done After The Initial Roughing In Of Copper Pipes, Electricals And Condensation Pipe To The Drain System
One Of The Multihead Split System Air conditioners Installed And All The Pipes and Electrics Connected After The Final Painting Is Done
Two Outdoor Motor Units Installed Using The Recommended Wall Brackets On the Wall Of The Seven Multi Head Indoor Units Inside
Pipe Covers To Cover The Copper Pipes, Electrical Connections And The Condensation Water Pipe For One Multi Head Split Air Conditioner